Key Downloads
& Publications

KP-RIISP operates through specialized implementation units to deliver improved services, infrastructure, and livelihoods

Agriculture Application Forms (Urdu)

Machinery

Agricultural Machinery Form

Official application form in Urdu for the procurement and allocation of modern agricultural machinery and equipment.

Download File
Barren Land

Barren Land Reclamation Form

Registration form to request developmental assistance and resources for cultivating and reclaiming barren land patches.

Download File
Land Protection

Land Protection Assistance Form

Institutional request form for implementing land protection infrastructure, soil stabilization, and flood mitigation support.

Download File
Workshop

Workshop Upgradation Form

Request documentation for technical modernization, diagnostic tool upgrades, and capacity training for agricultural workshops.

Download File

Agriculture Application Forms (English)

Crop Inputs

High-Value Crop Inputs Form

Application framework designed for obtaining premium agricultural inputs, specialized seeds, and advanced farming provisions.

Download File
Land Reclamation

Land Reclamation Form (KP-RIISP)

Standardized application protocol for land restoration, leveling, and agricultural development operations across targeted regions.

Download File
Soil Water

Soil & Water Conservation Form

Official department form for requesting field technical inspections and implementing strategic resource conservation measures.

Download File
Tunnel Farming

Tunnel Farming Installation Form

Detailed application framework and compliance terms for the deployment and monitoring of modern tunnel farming setups.

Download File

Grievance Redress Mechanism (GRM)

GRM Process

Complaint Registration Process

Step-by-step visual workflow mapping how project-affected citizens can log operational grievances via digital and physical portals.

Download File
GRM Tiers

Introduction to Tiers 1 & 2

Informational layout defining dispute resolution hierarchies, regional committee responsibilities, and processing timelines.

Download File
GRM Principles

Core Institutional Principles

Official governance transparency benchmarks detailing systemic accountability safeguards managed under the PCMU infrastructure.

Download File
GRM Channels

Complaint Channels & Resolution

Comprehensive operational matrix outlining field registration endpoints and formal tracking criteria for regional oversight.

Download File

Project Reports & Technical Checklists

Irrigation Report

KP-RIISP Irrigation Inception Report

Comprehensive engineering blueprint evaluating strategic water resource allocation metrics and irrigation channels across districts.

Download File
E&S Checklist

E&S Screening Checklist (Agriculture)

Mandatory environmental and social verification framework executed by the PIU to evaluate ecological safeguards prior to deployment.

Download File